Step #1 Project description and goals discussed by client and ECO2 - Submit this from email

Step #2 Design data submitted to ECO2 by client

1. Force Main Design Data ChecklistDownload PDF
2. Primary Clarifier Design Data ChecklistDownload PDF
3. Water Quality Design Data ChecklistDownload PDF

Step #3 Design data evaluated by ECO2 to determine technical fit.


Step #4 System design, estimated capital and annual O&M costs submitted to client by ECO2.


Step #5 ECO2 available to visit client, perform site assessment, confirm design data.


Step #6 Project moves forward


ECO2 provides

1. System design
2. Bid spec engineering support
3. SuperOxygenation cone
4. PLC oxygen flow control
5. Start-up, Testing, and Training

Sample Bid Spec Information
Sample Drawings

Others Provide

1. Site engineering
2. Bid spec document preparation
3. Installation
4. Side stream pump
5. Oxygen supply

Sample Scope of SupplyDownload PDF


Step #7 Project Complete - Video view of completed ECO2 system installed inside pump station